Learn how design choices, grid connection strategy and technology selection can influence project economics and long-term flexibility. Based on experience from 500+ MWh of grid-connected BESS projects across the Nordics. Enter your email and we will send you the guide straight to your inbox.
Five decisions shaping every BESS project:
Enter your email and we'll send the Nordic BESS developer's guide straight to your inbox.
Every BESS project is designed for seamless grid intregration, reliable, compliant, and ready for commercial operation.
Integrating battery storage with wind, solar and hydro assets requires new control systems alongside existing ones. We manage both.
Engineered to meet transmission and distribution grid requirements from day one.
Single point of accountability from site preparation through commercial operation.
Deep understanding of Swedish and Finnish grid codes, permitting, and climate conditions.
Learn how design choices, grid connection strategy and technology selection can influence project economics and long-term flexibility. Based on experience from 500+ MWh of grid-connected BESS projects across the Nordics. Enter your email and we will send you the guide straight to your inbox.
Enter your email and we'll send the Nordic BESS developer's guide straight to your inbox.
Five decisions shaping every BESS project:
Enter your email and we'll send the Nordic BESS developer's guide straight to your inbox.
Three examples from the Nordic BESS Developer's Guide. The full guide explores revenue strategy, system sizing, grid connection, system configuration and long-term market adaptability.
Hybrid projects can increase capture prices by storing generation for higher-value hours rather than exporting when prices are at their lowest.
PCS configuration, control architecture, grounding design and grid compliance planning can have a major impact on project performance long after procurement.
Connection capacity, compliance requirements and evolving grid codes can affect both project timelines and technical design.
NYAB has more than 500 MWh of grid-connected BESS projects delivered across Sweden and Finland.
20 MW / 40 MWh
Complete BESS EPC delivered on a turnkey basis integrated into existing solar park including EMS/SCADA and grid compliance process.
35 MW / 70 MWh
BOP BESS installation, 110 kV bay, 31.5 MVA transformer, 110 kV cabling to TSO substation and grid compliance process.
70 MW / 140 MWh
BOP BESS installation, extension of 110 kV bay, 80 MVA transformer and grid compliance process.
30 years of civil works experience, covering site preparation, earthworks, and foundation systems designed for Nordic conditions and long-term stability.
Full-scope in-house engineering, from system sizing to grid compliance verification including EMS and upper-level control design for hybrid configurations.
Hardware sourced and procured based on quality, grid compatibility, and long-term performance over the full project lifetime.
Comprehensive testing and commissioning, followed by remote monitoring, performance analytics, and Nordic service teams ensuring long-term performance.
Consolidating responsibility accelerates timelines, reduces interfaces, and delivers predictable outcomes.
With deep experience across Sweden and Finland, NYAB understands the unique requirements of Nordic energy infrastructure, from stringent grid codes and environmental permitting to construction in demanding climate conditions.
CONTACT US
From early feasability to commercial operation, we are ready to support your energy storage ambitions.
YOUR CONTACTS
Talk directly with the people working on BESS projects at NYAB.
© 2026 NYAB AB. All rights reserved. Privacy Policy
© 2026 NYAB AB. All rights reserved. Privacy Policy